KIPVIS CONTROL / DEVELOPMENT ROADMAP

Build it properly.
Prove each step.

Twelve planned phases for the new independent Kipvis Control, from the Go core and native host agent to advanced mod management, a qualified technical preview and multi-host expansion.

Design decisions 01–33 are recorded. No new-product implementation or completed phase gate is claimed. The old prototype remains separate.

NEW PRODUCT STATUS PLANNED
00 / 11

Planning baseline

33 decisions recorded · formal phase gate not yet verified

000102030405060708091011
0 / 12 phases verified · Phase 06 is the first technical preview gate

Four gates. No arbitrary percentages.

Release eligibility depends on demonstrated behavior, security, recovery and honest compatibility claims.

G1

Functional

Full universal lifecycle, comprehensive mods, repositories and advanced administration pass.

G2

Compatibility

Materially different server/mod mechanisms pass capability-driven qualification.

G3

Safety

Authorization, process boundaries, journal, interruption handling and recovery pass.

G4

Evidence

Test records, known limitations, supported environments and release approval exist.

No silent shortcuts

A release fails its gate if essential security or integrity tests fail—even if most of the interface works. Preview qualification is not a production-stability claim.

Development sequence

12 phases

Start with a sound baseline

00Specification & architectureAgree implementable contracts without using the legacy codebase.PLANNED

Work in this phase

  • Review all 33 decisions; publish the design baseline and trust boundaries.
  • Define API, extension, capability, data and operation contracts.
  • Record acceptance criteria, test evidence expectations and unresolved design choices.

Required prerequisites

—

Evidence to review

Signed-off requirements baseline, contract diagrams and risk register.

Condition for completion

Formal review confirms the Phase 00 architecture and verification contracts are ready for implementation.

A universal native manager

01Go management coreEstablish identity, authorization, state and durable operations.PLANNED

Work in this phase

  • Build management API, server registry, users, roles and scoped credentials.
  • Implement durable operation journal, approval rules, conflict controls and migrations.
  • Create focused security, failure-recovery and service-state tests.

Required prerequisites

00

Evidence to review

API test results, state journal replay/reconciliation, authorization evidence.

Condition for completion

Authorized, denied and interrupted operations have accurate persisted outcomes.

02Protected Linux host agentPerform only narrowly authorized native operating-system actions.PLANNED

Work in this phase

  • Build native Go agent and restricted host action contract.
  • Support safe service/file operations, resource monitoring and actual-state readback.
  • Prove game processes survive dashboard and agent control-plane interruption.

Required prerequisites

01

Evidence to review

Agent privilege tests, service lifecycle traces and non-interference results.

Condition for completion

Disposable services are managed without uncontrolled host privileges or unrelated side effects.

03Universal server lifecycleManage unfamiliar servers through automatic, import and custom paths.PLANNED

Work in this phase

  • Implement read-only discovery, executable profiles, installation plans and adoption.
  • Start, stop, restart, monitor, detach, archive and guarded delete.
  • Test different runtime/service mechanisms, custom and modified installations.

Required prerequisites

01, 02

Evidence to review

Startup and file-integrity traces, capability reports, failure-path tests.

Condition for completion

Materially different native server mechanisms complete lifecycle tests without core game branches.

Full administration and mod management

04Advanced administration & storageExpose complete technical tools with tested recovery.PLANNED

Work in this phase

  • Build TypeScript dashboard, consoles, configs, files, transfers and resource controls.
  • Provide backups, isolated restore, schedules and relevant network inspection.
  • Verify readback, file safety, transfer recovery and privilege boundaries.

Required prerequisites

01–03

Evidence to review

UI/API/agent traces, restore tests, data integrity and permission checks.

Condition for completion

Administration and storage workflows produce accurate state and recover safely.

05Comprehensive mods & extensionsDeliver repository-integrated advanced mods without game lock-in.PLANNED

Work in this phase

  • Build provider adapters, manual packages, metadata/dependency/conflict solver.
  • Implement modpacks, load order, version pinning, staging and rollback.
  • Create profile/extension contracts, scoped workers and compatibility verification.

Required prerequisites

01–04

Evidence to review

Multiple mod-mechanism test records, extension denial tests, verified rollback evidence.

Condition for completion

Comprehensive supported mod workflows pass integration, safety and recovery tests.

06Technical preview qualificationRelease only after four mandatory evidence gates pass.PLANNED

Work in this phase

  • Qualify broad server, mod, repository, distribution and Linux mechanisms.
  • Run integration, security, crash/interruption and regression tests.
  • Document feature states, known issues, supported environment versions and sign-off.

Required prerequisites

00–05

Evidence to review

G1–G4 test reports, capability matrix, supported environment matrix and approval.

Condition for completion

Qualified preview explicitly approved; any critical security or integrity failure blocks it.

Operations and reliable releases

07Advanced operations & observabilityExpand network control, alerting and diagnostics beyond initial preview.PLANNED

Work in this phase

  • Add authorized firewall/port management and resource profiles.
  • Develop historical telemetry, incident timelines, notification rules and extended CLI/API.
  • Exercise permission boundaries, failed infrastructure changes and alarm reliability.

Required prerequisites

01–06

Evidence to review

Firewall and port conflict tests, diagnostic and telemetry reports.

Condition for completion

Expanded operational features meet their declared OS/permission contracts.

08Native release engineeringMake updates, repair, uninstall and stable releases dependable.PLANNED

Work in this phase

  • Package native Linux installer and first-run setup.
  • Add controlled panel updates, verified backups, upgrade/rollback and repair.
  • Document stable support matrix, incident recovery and compatibility release process.

Required prerequisites

01–07

Evidence to review

Install/upgrade/failure/repair/uninstall regression evidence.

Condition for completion

Stable release only includes capabilities meeting all applicable safety and recovery gates.

Additional hosts and extension maturity

09Remote Linux hostsConnect multiple machines without losing local independence.PLANNED

Work in this phase

  • Secure host pairing, revocation, credential rotation and remote operations.
  • Implement disconnection-safe task ownership, fleet metrics and direct transfers.
  • Test cross-host migration and agent reconnection without duplicated writes.

Required prerequisites

02, 07, 08

Evidence to review

Host isolation tests, reconnect/fencing checks and verified migration.

Condition for completion

Two or more hosts can be managed within declared permissions, without reliance on continuous dashboard connectivity.

10Windows native host agentExtend supported behavior through real Windows operating-system facilities.PLANNED

Work in this phase

  • Implement native Windows services, filesystem controls and agent policies.
  • Declare OS-specific capability differences and migration incompatibilities.
  • Run real Windows lifecycle, resource, security and recovery tests.

Required prerequisites

09

Evidence to review

Windows support matrix, native agent acceptance reports and failure results.

Condition for completion

Windows claims match observed behavior, not assumed Linux parity.

11Extension ecosystem maturityEnable independent publishing and long-term compatibility.PLANNED

Work in this phase

  • Publish developer tooling, profile schemas and public worker API samples.
  • Improve compatibility management, provenance information and optional catalogue.
  • Verify community integration without proprietary core-source access.

Required prerequisites

05, 06

Evidence to review

Independent extension build/install tests, API-version and permission tests.

Condition for completion

Community extensions work without an official marketplace or privilege bypass.

Build beneath the feature, not around it.

Core security, operation persistence and backup safety are prerequisites—not optional polish at the end.

DEPENDENCY CHAIN / QUALIFIED PREVIEW↳ 00 → 06
00Contracts

Decisions and test criteria

01Management core

API, identity and journal

02Native agent

Controlled host execution

03Server lifecycle

Generic install and adoption

04Admin and mods

Protected files and extensions

05Release gate

G1–G4 evidence and approval

↶

Phases may overlap, but later state-changing operations cannot bypass earlier security or recovery prerequisites.